Read about the YESIL hydroelectric power plant in Turkey and its contribution to renewable electricity generation and regional development.



The YESİL Hydro Electric Power Plant (HEPP) is a grid-connected small-scale hydropower plant with a run-of-river reservoir in Sivas province, Turkey. The total installed capacity of the Project is 14 MW, comprising three 4.666 MW turbines, with a predicted electricity supply to the grid of 56.16 GWh per annum.
The project is composed of a regulator, conveyance channel, headpool and a powerhouse. The regulator consists of water inlet structure, sediment pool, hard-filled weir and gravel passage. Water will be diverted at the regulator from 1,431 meters of altitude via the conveyance channel of 8,000 m and channelled into the headpool at the 1,426 m. Through penstocks of 840 m (total), the water will be carried to the powerhouse where two vertical type of Francis turbines lie.Browse independently verified projects with CRISP ratings on the Carbon Marketplace (carbonfootprint.store), buy online in minutes and receive proof of retirement for every credit.
Browse the Carbon MarketplaceEnter your tonnes of CO2 and get prices for verified carbon credit projects of any size on the Carbon Marketplace.
Support high-integrity projects like this one through the Carbon Marketplace, or ask our team to build a portfolio for you.