Carbon Credits · Projects

Indonesia Geothermal

Wayang Windu Phase 2 Geothermal Power Project

Indonesia Geothermal
vcslogo.jpg

Geothermal power plants use steam produced from reservoirs of hot water found a couple of miles or more below the Earth's surface, instead of having to use fossil fuels. The steam rotates a turbine that activates a generator, which produces electricity. It is a natural and sustainable source of energy.

Wayang Windu Phase 2 Geothermal Power Project, is a 117MW geothermal power station, which is an additional power unit to an existing grid-connected renewable power plant. The project involves the generation of power using a reliable and renewable resource in place of power generation by a more greenhouse gas intensive fuel/source. The project reduces greenhouse gas emissions through the displacement of fossil fuel electricity generation with a clean, renewable energy source. 

Additional Benefits:

 un_energy_icon.jpg un_economic_icon.jpg un_infrastructure_icon.jpg un_climate_icon.jpg


Carbon Marketplace

Buy high-quality, high-integrity carbon credits

Browse independently verified projects with CRISP ratings on the Carbon Marketplace (carbonfootprint.store), buy online in minutes and receive proof of retirement for every credit.

Browse the Carbon Marketplace

Fcarbon footprint calculation

Ready to offset?

Already calculated your carbon footprint?

Enter your tonnes of CO2 and get prices for verified carbon credit projects of any size on the Carbon Marketplace.

tCO2e

Not calculated it yet? Use our free calculators.

Fund verified carbon credits

Support high-integrity projects like this one through the Carbon Marketplace, or ask our team to build a portfolio for you.

Visit the Marketplace →Talk to our team